Vertec Home Page
Vertec Home Page
local equipment rooms, DNV, control cabins
hire cabins, switchgear, ATEX, Norsok, tactical shelters
process packages
hire cabins and equipment rental
HVAC, air conditioning & refrigeration
Vertec case studies
 

Site Map

Legal Information

1st Point quality standards

ISO 9001 accreditation

© Vertec 2005

Site by Artech

Fire protected (A60 – H60) cabins  
Vertec Home Page Specialist manufacturing services Vertec News Vertec Vacancies Contact Vertec Offshore oil and gas industries glossary Vertec links Vertec Site Map
Specialist manufacturing services to the offshore oil and gas industries
Fire protected cabins to international standards
EEMUA I58
BS EN 12079
DNV 2.7-1
DNV 2.7-2
Norsok
P.E.D
ATEX / IEC
ASME VIII
ASME 31.3B
PD5500
Fire Protection (A60/H60)
ISO 9000
BS EN ISO 9001:2000
local equipment rooms, DNV, control cabins

› Mobil – Beryl Alpha Platform
Baker Hughes Centrilift – Santos
Kellogg Brown & Root/ExxonMobil
Petreco International/AMEC

Mobil – Beryl Alpha Platform

This innovative 35 tonne LER contained switchgear, transformers and associated control components and was an integral part of an offshore Glycol Regeneration Package. Utilising lightweight H60 stainless steel panels coupled with stringent weight control procedures, the target finished weight was significantly bettered.

The HVAC plant consisted of a roof mounted air handling unit having duty and stand-by fans each of 100% capacity. In addition, an air conditioning unit provided cooling to the LER via evaporators mounted internally, the associated compressors and condensers having 60% capacity operating on a ‘lead-lag’ basis.

Maximum pre-commissioning was carried out at Vertec’s Aberdeen facility enabling the LER to be rapidly hooked-up offshore.